COVID-19 Vaccination Clinic Renovation
Project Overview
JPD Contracting was engaged by Fraser Health Authority to deliver tenant improvement renovations for a COVID-19 Vaccination Clinic at 30/40 – 45850 Yale Rd, Chilliwack, BC. The objective was to adapt and upgrade the existing space to support healthcare operations during the pandemic, ensuring a safe, functional, and efficient environment for staff and patients.
 
															 
															Scope of Work
The renovation scope covered all major trades and management functions required to transform the clinic into a fully operational healthcare environment:
- Selective demolition, new framing, and drywall installation to prepare and reconfigure spaces.
- Painting of new wall finishes to achieve a clean, durable finish.
- Flooring installation and repairs in washrooms and other designated areas.
- Installation of new baseboards to complete wall finishes.
- Plumbing rough-in and installation of finishing fixtures, including re-installation of a relocated toilet.
- Electrical rough-in and installation of finishing components, including upgraded lighting as required.
- Construction of a new enclosed room, framed with studs, completed with a steel door, and including all required rough-in work for windows, doors, and services.
- Full project management and coordination, working hand-in-hand with Fraser Health managers to align schedules, maintain infection control standards, and support one another during a period of extraordinary healthcare demand.
Key Deliverables
- Executed all work in full compliance with Fraser Health Authority’s strict safety, privacy, and operational requirements.
- Coordinated construction around sensitive healthcare operations to minimize disruption to staff and patients.
- Leveraged infection control–certified project managers to ensure safety and compliance in a clinical environment.
- Provided a seamless project management approach that maintained progress despite heightened operational pressures.
- Actively pursuing COR Certification, with final audits scheduled for Fall 2025, underscoring our long-term commitment to health, safety, and continuous improvement.
Outcome
The renovated clinic enabled Fraser Health Authority to quickly expand vaccination capacity in Chilliwack, directly supporting the community’s COVID-19 response. The project showcased JPD Contracting’s ability to deliver healthcare-focused tenant improvements under demanding conditions — balancing speed, safety, and precision while supporting frontline health teams in a time of critical need.
